• InfraWorks

Reduce Project Costs by Running a Corridor Optimization in InfraWorks

Keep project costs down by analyzing the proposed roads for the best horizontal placement and vertical design. Learn how to run a Corridor Optimization and a Profile Optimization to produce multiple design options and reduce project costs.


‌

Module overview

Keep project costs down by analyzing the proposed roads for the best horizontal placement and vertical design. Learn how to run a Corridor Optimization and a Profile Optimization to produce multiple design options and reduce project costs.

This module takes approximately 20 minutes to complete. By the end of the module, you should be able to:

  • Analyze the Plan and Profile on a Road
  • Run a Sight Distance Analysis
  • Run a Profile Optimization
  • Run a Corridor Optimization

Before you start

  • Please make sure you have the InfraWorks software loaded. 
  • If you have technical difficulties, please reach out to product support.

Module downloads

These downloadable resources will be used to complete units in this module:

Related learning

Course3 hr. 25 min.
InfraWorks, ReCap, Civil 3D

View
Course
InfraWorks, Civil 3D, Revit, Structural Bridge Design
Course3 hr. 40 min.
InfraWorks, Civil 3D, Storm and Sanitary Analysis...
Course2 hr.
PowerMill
Module15 min.
InfraWorks
Module20 min.
InfraWorks
Module20 min.
InfraWorks
Module20 min.
InfraWorks
Course1 hr. 25 min.
InfraWorks
Course1 hr.
Navisworks Manage, InfraWorks, 3ds Max