Identify analytical space properties following an analysis, compare analysis report styles, and interpret the results.
Type:
Tutorial
Length:
7 min.
Transcript
00:04
The calculated results in the systems analysis report and in the analytical
00:08
spaces of a project are derived from many different areas and settings
00:13
and can be used to review values,
00:15
compare design options and to drive the direction of change in your project.
00:20
In this project,
00:21
we will access sections of the analysis report
00:24
and values from the analytical spaces to gain
00:27
an insight into the equipment requirements and calculated
00:30
values for the analytical systems previously specified.
00:35
Ensure the view is set to reports,
00:38
analysis reports and conceptual analysis.
00:43
There are two types of report produced for the analysis,
00:46
a detailed report and a loads report
00:49
from the report properties,
00:51
select the dropdown menu against report style and choose detailed
00:59
at this point, close the system browser so that it's easier to review the report.
01:06
The detailed report is very extensive.
01:08
So to access the information we're looking for, select the table of contents
01:14
from the table of contents, select equipment summary.
01:19
At an earlier stage, we specified water loops for chilled condenser and hot water.
01:25
The analysis report shows the necessary equipment for the water loops
01:29
and the calculated values based on the project variables previously established
01:36
at an earlier stage. An air system was also defined
01:39
and the report shows the calculated values for the cooling coil in the air system.
01:43
We named a
01:44
U 01.
01:47
Scroll further down the report to the section on heating coils to review the
01:52
calculated values for the zone equipment applied to each of the analytical spaces.
01:60
The report also contains information on the fans
02:03
and pumps specified in the analytical systems.
02:08
Finally scroll down to the H VAC sizing summary where the
02:12
calculated values for cooling design load and flow rates can be seen
02:20
from the report properties change the report's style to loads.
02:28
The loads report has less information is easier to
02:31
navigate and is broken down into three main areas.
02:36
Zone load summary
02:38
system load summary
02:40
and design psychometrics
02:44
at the top of the report change the units to IP units.
02:52
The zone load summary area focuses on the zone equipment specified previously
02:58
from the dropdown menu select va V 01-5.
03:05
The information displayed can be toggled between cooling and heating.
03:11
The information includes peak environmental conditions,
03:15
engineering checks and then a breakdown for
03:18
peak loads and cooling load components.
03:23
The main section of the table totals the gains from the building envelope,
03:27
the internal gains and the gains from the systems.
03:31
The percentage contribution for each load component is
03:34
displayed at the end of the table.
03:38
The system load summary area of the report is similar to the zone load summary
03:43
but references the analytical air system A
03:46
U 01 created earlier in the project.
03:50
The values can be toggled between heating and cooling loads.
03:55
It contains information about the peak environmental conditions
04:00
and information on the air temperature at different points in the system.
04:06
It also displays the flow rates for the main fan and for ventilation.
04:13
The design psychometric section of the report relates
04:16
to the cooling coil for the air system.
04:19
A
04:19
U 01.
04:21
It includes a summary and a psychometric chart.
04:26
The table beneath the report
04:28
displays the remaining psychometric information needed
04:31
to understand the condition of the air within the analytical system.
04:37
Finally, we'll review the property values in an analytical space.
04:43
Activate the system browser if it's not already open
04:49
from the dropdown menu. Select analytical systems
04:55
from the list in the system browser. Expand va V 011
05:00
and select the analytical space one.
05:05
Following the analysis.
05:07
A review of the properties shows an updated summary
05:10
for the calculated values for peak heating load,
05:14
peak cooling load and the peak latent cooling load.
05:20
A review of the space type in the properties shows the values in this
05:24
analytical space are taken from the hospital
05:27
healthcare default building type specified at the start
05:34
open. The analytical spaces view from the project browser
05:40
from the screen, select the analytical space where a rivet space was also placed.
05:49
A review of the properties shows the space type is physical therapy.
05:55
And as such,
05:55
we can gain a greater level of control over the values used in the systems analysis.
06:01
And the results produced in the report,
06:05
performing a mechanical systems analysis and reviewing the report
06:10
provides a comprehensive breakdown and overview of your project.
06:14
Equipment and sizing requirements can be
06:16
determined without having to place any physical
06:19
equipment or create duct and piping networks to establish the same information,
06:26
performing mechanical systems analysis early and often will provide
06:30
the information necessary to make informed decisions on system design
06:34
and will provide the basis for early stage comparative
06:37
analysis to determine the optimum design for your project.
Video transcript
00:04
The calculated results in the systems analysis report and in the analytical
00:08
spaces of a project are derived from many different areas and settings
00:13
and can be used to review values,
00:15
compare design options and to drive the direction of change in your project.
00:20
In this project,
00:21
we will access sections of the analysis report
00:24
and values from the analytical spaces to gain
00:27
an insight into the equipment requirements and calculated
00:30
values for the analytical systems previously specified.
00:35
Ensure the view is set to reports,
00:38
analysis reports and conceptual analysis.
00:43
There are two types of report produced for the analysis,
00:46
a detailed report and a loads report
00:49
from the report properties,
00:51
select the dropdown menu against report style and choose detailed
00:59
at this point, close the system browser so that it's easier to review the report.
01:06
The detailed report is very extensive.
01:08
So to access the information we're looking for, select the table of contents
01:14
from the table of contents, select equipment summary.
01:19
At an earlier stage, we specified water loops for chilled condenser and hot water.
01:25
The analysis report shows the necessary equipment for the water loops
01:29
and the calculated values based on the project variables previously established
01:36
at an earlier stage. An air system was also defined
01:39
and the report shows the calculated values for the cooling coil in the air system.
01:43
We named a
01:44
U 01.
01:47
Scroll further down the report to the section on heating coils to review the
01:52
calculated values for the zone equipment applied to each of the analytical spaces.
01:60
The report also contains information on the fans
02:03
and pumps specified in the analytical systems.
02:08
Finally scroll down to the H VAC sizing summary where the
02:12
calculated values for cooling design load and flow rates can be seen
02:20
from the report properties change the report's style to loads.
02:28
The loads report has less information is easier to
02:31
navigate and is broken down into three main areas.
02:36
Zone load summary
02:38
system load summary
02:40
and design psychometrics
02:44
at the top of the report change the units to IP units.
02:52
The zone load summary area focuses on the zone equipment specified previously
02:58
from the dropdown menu select va V 01-5.
03:05
The information displayed can be toggled between cooling and heating.
03:11
The information includes peak environmental conditions,
03:15
engineering checks and then a breakdown for
03:18
peak loads and cooling load components.
03:23
The main section of the table totals the gains from the building envelope,
03:27
the internal gains and the gains from the systems.
03:31
The percentage contribution for each load component is
03:34
displayed at the end of the table.
03:38
The system load summary area of the report is similar to the zone load summary
03:43
but references the analytical air system A
03:46
U 01 created earlier in the project.
03:50
The values can be toggled between heating and cooling loads.
03:55
It contains information about the peak environmental conditions
04:00
and information on the air temperature at different points in the system.
04:06
It also displays the flow rates for the main fan and for ventilation.
04:13
The design psychometric section of the report relates
04:16
to the cooling coil for the air system.
04:19
A
04:19
U 01.
04:21
It includes a summary and a psychometric chart.
04:26
The table beneath the report
04:28
displays the remaining psychometric information needed
04:31
to understand the condition of the air within the analytical system.
04:37
Finally, we'll review the property values in an analytical space.
04:43
Activate the system browser if it's not already open
04:49
from the dropdown menu. Select analytical systems
04:55
from the list in the system browser. Expand va V 011
05:00
and select the analytical space one.
05:05
Following the analysis.
05:07
A review of the properties shows an updated summary
05:10
for the calculated values for peak heating load,
05:14
peak cooling load and the peak latent cooling load.
05:20
A review of the space type in the properties shows the values in this
05:24
analytical space are taken from the hospital
05:27
healthcare default building type specified at the start
05:34
open. The analytical spaces view from the project browser
05:40
from the screen, select the analytical space where a rivet space was also placed.
05:49
A review of the properties shows the space type is physical therapy.
05:55
And as such,
05:55
we can gain a greater level of control over the values used in the systems analysis.
06:01
And the results produced in the report,
06:05
performing a mechanical systems analysis and reviewing the report
06:10
provides a comprehensive breakdown and overview of your project.
06:14
Equipment and sizing requirements can be
06:16
determined without having to place any physical
06:19
equipment or create duct and piping networks to establish the same information,
06:26
performing mechanical systems analysis early and often will provide
06:30
the information necessary to make informed decisions on system design
06:34
and will provide the basis for early stage comparative
06:37
analysis to determine the optimum design for your project.
Industry:
Role:
How to buy
Privacy | Do not sell or share my personal information | Cookie preferences | Report noncompliance | Terms of use | Legal | © 2025 Autodesk Inc. All rights reserved
Sign in for the best experience
Save your progress
Get access to courses
Receive personalized recommendations
May we collect and use your data?
Learn more about the Third Party Services we use and our Privacy Statement.May we collect and use your data to tailor your experience?
Explore the benefits of a customized experience by managing your privacy settings for this site or visit our Privacy Statement to learn more about your options.