Create, edit, and rename pressure pipe networks using layout tools.
Type:
Tutorial
Length:
2 min.
Transcript
00:04
The two blue circles in the drawing represent the existing fire hydrants.
00:10
And we're going to draw a pipe network to represent the existing network
00:15
from surveys.
00:16
We've been told that the existing pressure pipe network has a 6 ft cover distance
00:22
from the existing ground level.
00:24
And we've been given the layout of the pipes represented by the dashed red line
00:30
to start drawing the pipe run.
00:32
We're going to right click on pressure networks from within the prospector tab
00:37
and click create pressure network by layout,
00:41
we can then name the pressure network.
00:46
Pick a parts list,
00:48
choose a reference surface
00:50
and add the 6 ft cover level.
00:53
We can then click OK. To start drawing the network,
00:58
we click once to start a pipe
01:01
and then wants to add a new joint.
01:04
As you'll notice you're restricted to the angles that you can draw pipes at
01:09
these angles are determined by the joints that you have within your parts list.
01:16
When we get to the curve,
01:18
we can type C and press enter which will then allow us to draw a curve.
01:23
We then click once to set the start angle
01:28
and we click again
01:29
for the end of the pipe,
01:32
we can then press s which will then allow us to go back to drawing straight pipes.
01:40
Once we've finished our pipe run, we can press enter to finish the run.
Video transcript
00:04
The two blue circles in the drawing represent the existing fire hydrants.
00:10
And we're going to draw a pipe network to represent the existing network
00:15
from surveys.
00:16
We've been told that the existing pressure pipe network has a 6 ft cover distance
00:22
from the existing ground level.
00:24
And we've been given the layout of the pipes represented by the dashed red line
00:30
to start drawing the pipe run.
00:32
We're going to right click on pressure networks from within the prospector tab
00:37
and click create pressure network by layout,
00:41
we can then name the pressure network.
00:46
Pick a parts list,
00:48
choose a reference surface
00:50
and add the 6 ft cover level.
00:53
We can then click OK. To start drawing the network,
00:58
we click once to start a pipe
01:01
and then wants to add a new joint.
01:04
As you'll notice you're restricted to the angles that you can draw pipes at
01:09
these angles are determined by the joints that you have within your parts list.
01:16
When we get to the curve,
01:18
we can type C and press enter which will then allow us to draw a curve.
01:23
We then click once to set the start angle
01:28
and we click again
01:29
for the end of the pipe,
01:32
we can then press s which will then allow us to go back to drawing straight pipes.
01:40
Once we've finished our pipe run, we can press enter to finish the run.
How to buy
Privacy | Do not sell or share my personal information | Cookie preferences | Report noncompliance | Terms of use | Legal | © 2025 Autodesk Inc. All rights reserved
Sign in for the best experience
Save your progress
Get access to courses
Receive personalized recommendations
May we collect and use your data?
Learn more about the Third Party Services we use and our Privacy Statement.May we collect and use your data to tailor your experience?
Explore the benefits of a customized experience by managing your privacy settings for this site or visit our Privacy Statement to learn more about your options.