Run detailed simulations
Information in the simulation can be modified by changing the order of tasks and by subdividing the building into work packages that allow for the most efficient flow of activity on site in order to save time and money.
After completing this video, you’ll be able to:
- Link an external construction sequence plan.
- Assign elements to location-based tasks.
- Run a detailed simulation.
Any referenced datasets can be downloaded from "Module downloads" in the module overview.