Â
 |
Completion Time:Â Â 15 Minutes
|
        Completion of the Update and Retag Drawings Lesson
 |
Objective:Â Â In this exercise, you update, retag, and resequence the Schematic Editing project. You change the component tags from reference-based to sequential, and change the inter-drawing cross- referencing to display the sheet and rung number.
|
 |
1:  If the Project Manager is not displayed, on the Project tab, Project Tools panel, click Manager.
Â
|
 |
2:  If Schematic_Editing_NFPA is the active project, skip to step 6. If it is open but not active, in the Project Manager, do the following: ■Right-click Schematic_Editing_NFPA. ■Click Activate. ■Skip to step 6.
|
 |
3:  In the Project Manager, click Open Project.
Â
|
 |
4:  Browse to where you installed the exercise files. Select Schematic_Editing_NFPA.wdp. Click Open.
|
 |
5:  In the Projects list, click the expansion node next to Schematic_Editing_NFPA to expand the drawing list.
|
 |
6:  Right-click Schematic_Editing_NFPA_04.dwg. Click Open.
|
 |
7:  Zoom in to the right side of rungs 407-409.
Â
Notice the relay tag and cross-reference values.
|
 |
8:  On the Project tab, Project Tools panel, click Update/Retag.
Â
|
 |
9:  In the Project-Wide Update or Retag dialog box, select Component Retag.
|
 |
10:  Select Component Cross-Reference Update.
|
 |
11:  Clear the Wire Number and Signal Tag/Retag check box.
Â
|
 |
12:  Select Other Configuration Settings.
|
 |
13:  Click Setup for other configuration settings.
|
 |
14:  In the Change Each Drawing's Settings dialog box, select Component Tagging Settings.
|
 |
15:  Click Sequential. For Sequential, enter a start value of 1.
|
 |
16:  Select Inter-Drawing Cross-References.
|
 |
17:  For Format, type "%S%N" then click OK.
|
 |
18:  In the Project-Wide Update or Retag dialog box, click OK again.
|
 |
19:  In the Select Drawings to Process dialog box, click Do All. Click OK.
|
 |
20:  If requested, in the Qsave dialog box, click Always Qsave. The project drawings are sequentially processed.
|
 |
21:  Zoom in to the right side of rungs 407-409.
Â
Notice the sequential tag names on the relay coils. The contact cross-reference on CR3 displays only rung numbers for contacts on this drawing, but it displays the sheet and rung number for contacts on different drawings.
|
|