Description
NEXCO CENTRAL is a road management company constructing and managing highways in the central Japan area (total length: 2,183 km). Impeding challenges—aging highways and labor shortages in the construction industry—make the improvement on productivity at construction sites a high priority. In an attempt to tackle down the challenges, we started considering using BIM from 2017 to shift from analog data-centered to digitized-data-centered construction management. In 2020, we’d established standards necessary for BIM use and set a policy to embrace intelligent models in design and construction phases, ICT construction, and a common data environment (CDE). Based on this policy, BIM was finally applied to the design and construction phase from July 2025. In addition, we adopted Construction Cloud to realize a CDE to streamline the legacy means of communication between multiple project stakeholders. In this session, you will gain insights and tips on how to realize an owner-led CDE.
Key Learnings
- Gain insights into the best practice for using a CDE in civil infrastructure industry.
- Learn about structuring internal stakeholder governance to build an owner-led CDE.
- Learn about building workflows to streamline ways of communicating and sharing data between owners and contractors.
- Learn about fostering owner and contractor motivation to embrace CDE.